Categories | Auto Injection Molding Machine |
---|---|
Brand Name: | Taihong |
Model Number: | bottle cap moulds |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | 1 |
Price: | negotiable |
Payment Terms: | T/T |
Supply Ability: | 20sets/month |
Delivery Time: | 45days |
Packaging Details: | Export standard |
Mould material: | NAK20,S136,P20.718H,738H,45#,etc |
Mould base: | LKM;HASCO;DME,etc |
Runner: | hot/cold runner |
Cavity: | 8 cavities |
Company Info. |
Ningbo Haijiang Machinery Co.,Ltd. |
Verified Supplier |
View Contact Details |
Product List |
High-Precision PET Water Drink Mould Manufacturing
Business Steps
1. R& D We support customers' R& D. We'll make the files or
improve the design if you need
2. Quotation Making Mould Quotation will be finished in 1 day
according to information we get.
3. Negotiation The negotiation includes quality, price, material,
delivery time, payment item, ect.
4. Mould Design We need to spend 3-5 days on mould and product
3D/2D drawing design
5. Mould We will build the mould based on customers' requirements.
Before making the mould, we'll send mould design to get customers'
approval first. Mould will be usually completed in 25-60 days
6. Mould Testing When moulds are finished, we will test the moulds
to check if they will satisfy consumers' needs. And we will send
samples for consumers' reference.
7. Sample shoot If the first sample come out is not satisfied by
customers, we will modify the mould until it can meet customers'
needs.
8. Delivery We'll delivery goods either by sea or by air, according
to customers' requirements.
Mould Information:
Mold information | content |
Product Material | ABS,PP,PC,PA,PMMA,PS,POM and etc. |
Moldbase | FUTABA,LKM,HASCO,DME you can choose |
Cavity material | 45#,50#,P20,H13, 718 2738, NAK80, S136, SKD61 etc |
Runner | Cold/Hot runner |
Cavity | Multi or single cavity |
Standart parts | Hasco |
Gate type | Side gate,Sub gate,Pin point gate,Edge gate etc |
Treatment | Heat treatment and Nitriding,polish ect. |
HRC | H45~52 |
Product weight | 50~5000K |
Machine type | 250Ton |
The standard of appearance of the products for stripe | MT(Mold Tech),YS,HN series |
The way of Color contrast | RAL K7,PANTONE |
Plastic Mold (Moulds) production process | Description |
1. 3d Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2 .Negotiations | Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, part cost, payment, moulds lifetime, delivery, etc. |
3. Purchasing Order | After the customer confirming the mould design and quotation. |
4. Making mold(moulds) | Confirm drawing, start to do DFM,mold flows and mold detail agreed with the customer, start production. |
5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
6. sample shoot | We provide the moulds test samples for confirmation(about 10-15 piece), then, get your signature sample ,mass production. |
7. Package | Wooden case for moulds, cartons for parts ,or as your requiretment. |
8. Delivery | deliver goods by air or by sea. |
About Us
Customer Services
Sell On Us
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们
Copyright © 2009 - 2019 7cha.net. All rights reserved.